British Lifetime Material Energy Power Station Seeking Chinese Investors


A planned biomass power station in the UK is looking for a partner. The power station uses renewable energy to provide combined electricity and heat and is expected to operate for 25 years. After the power station is completed and connected to the grid, the annual power generation capacity is 40 MW, which can be used by 62000 to 68000 households, and the annual carbon dioxide emission is reduced by 120000 tons.
A planned biomass power station in the UK is looking for a partner. The power station uses renewable energy to provide combined electricity and heat and is expected to operate for 25 years. After the power station is completed and connected to the grid, the annual power generation capacity is 40 MW, which can be used by 62000 to 68000 households, and the annual carbon dioxide emission is reduced by 120000 tons. The power station is located in the transportation hub area with convenient transportation. At present, the project operator is interested in looking for investors of 40 million to 50 million pounds. The project expects a 20% return on equity investment (IRR).
The power station uses rape, cereal straw, purple mans, wood chips and other materials to generate electricity. The main raw material supply comes from the farm cooperation organization in the region, which has 8000 member farmers. The power station operator will sign a long-term supply contract with the farm cooperative organization to ensure an adequate supply of required raw materials. The ash produced by the burning of the raw materials will be sold back to local farms for use as fertilizer.
The power station has an advantageous geographical location and is adjacent to important economic development zones and major residential development zones planned by the government. A surrounding area of 30 hectares is an industrial development zone for the development of commerce and light industry. It is estimated that by 2026, the power demand of the industrial zone will reach 18 to 22 MVA. At the same time, a number of obsolete power stations will be closed in the near future, and the existing power supply will not be able to meet the requirements of development. New power stations will solve this problem and greatly promote the development of commerce and light industry in the surrounding areas. In addition, there is a test racing field near the power station, which was rebuilt from the Royal Air Force base during World War II. The development of the existing power facilities is limited. After the power station is completed, the racing field can obtain sufficient and stable energy supply. In addition, the steam and heat generated in the power generation process can also be sold to the heating system of surrounding enterprises and houses.
In the UK, renewable energy projects enjoy government subsidies. The project will receive a government subsidy of £ 61.07 per MWh of renewable energy obligation permits, in addition to an additional subsidy of 0.5 renewable energy obligation permits per MWh as the project is a cogeneration.
Main structure of power station:
Turbine and boiler house (2356.68 m2, 30 m high)
Two wheat straw and purple awn raw material storage warehouses (each with an area of 3530 square meters and a height of 17.6 meters)
A sawdust storage silo (area 630 square meters, height 17.6 meters)
One outdoor haystack (height 60 m)
One air condensing machine room (area 2034 square meters, height 20 meters)
Project Schedule
Application for Project Planning Permission submitted in January 2012
Application for environmental permit submitted in March 2012
Planning permission approved in June 2012
September 2012 expected environmental permit approved
Construction started in spring 2013.
Construction is expected to last two and a half years
 
If there is a need for cooperation, please contact the company.